We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Jacking method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Jacking method Product List and Ranking from 4 Manufacturers, Suppliers and Companies

Jacking method Product List

1~7 item / All 7 items

Displayed results

Non-excavation thrust construction method "Hammerhead Mole"

Effective in reducing civil engineering construction time and costs. Proven results worldwide.

The non-excavation thrust method "Hammerhead Mole" is an extremely lightweight air-powered, self-propelled thrust machine that contributes to environmental sustainability and cost reduction. The thrust method involves using the air-powered, self-propelled machine "Hammerhead Mole" to compactly advance underground and insert the necessary pipes into the thrust hole. For more details, please download the catalog.

  • Other work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD method (guided horizontal drilling) achieves shortened construction time and labor savings!

Piping and wiring burial system (non-excavation and thrust method)! Numerous achievements! Attention on "overhead wire elimination"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and sewage, electricity, gas, and communication is becoming increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method for burying pipes and cables using non-excavation techniques, which reduces traffic disruption and soil disposal issues. It allows for clean and highly safe construction by detecting the construction position from above ground while advancing. In recent years, labor shortages and rising maintenance costs for facilities have become social issues, and from the perspective of shortening construction periods and reducing total costs, the HDD method (Horizontal Directional Drilling) / TerraJet is gaining attention as a method for burying water supply and sewage pipes, gas pipes, and power cables underground. In Europe and the United States, this method is known as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), no-dig, trenchless, and horizontal directional drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD method (guided horizontal drilling) achieves shortened construction time and labor savings!

Piping and wiring burial system (non-excavation and thrust method)! Numerous achievements! Notable for "overhead line removal"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and drainage, electricity, gas, and communication is becoming increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method for burying pipes and cables using non-excavation techniques, which reduces traffic disruption and soil disposal issues. It allows for clean and highly safe construction by detecting the construction position from the surface while advancing. In recent years, labor shortages and rising maintenance costs for facilities have become social issues. From the perspective of shortening construction periods and reducing total costs, the HDD method / TerraJet is gaining attention as a technique for burying water supply and drainage pipes, gas pipes, and power cables underground. In Europe and the United States, this method is known as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), no-dig, trenchless, and horizontal directional drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small Diameter Pipe Pushing Method "Three Pipe King (R) DRM MVP1450"

The construction pipe diameter can accommodate small diameter pipe jacking methods for PVC pipes from φ150 to φ250!

The "Sanguan King (R) DRM MVP1450" is a thrusting machine that can be launched in locations where there are many buried objects such as gas pipes and water pipes, and can only be constructed in a shaft with an inner diameter of 1450 (liner 1500). If the pressure of the hydraulic unit is 21 MPa or higher, it can be operated with your existing unit. 【Main Specifications】 ■ Minimum launch shaft: φ1450 (1500 liner plate) ■ Pipe type for construction: Rigid PVC pipe (adhesive spiral joint) ■ Thrusting ・ Thrust force: 206KN (21MPa) 294KN (30MPa) ・ Pull force: 140KN (21MPa) 202KN (30MPa) ・ Speed: -cm/min ・ Stroke: 1,080min, etc. * For more details, please download the PDF or feel free to contact us.

  • Other industrial robots

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ogre combined pressure insertion method installation pipe advancement method 'Strike Method'

A construction method for installation pipes using a combined auger and pressure insertion method that employs special branch pipes equipped with earthquake resistance and water tightness!

The "Strike Method" is a pipe installation and pushing method that combines effective ground improvement by injecting chemical solutions after the arrival of the casing pipe at the main pipe to be installed. Even when installing the main pipe under busy roads, construction can be carried out from a distant shaft, contributing to the alleviation of traffic congestion. 【Features】 ■ Installation of a φ150mm pipe onto a φ200mm PVC pipe ■ Installation onto fume pipes and shields ■ Starting from a φ2,000 casing shaft (a φ1,500 casing shaft is also possible; calculations are separate) ■ Injection of chemical solutions into the reaching section can be performed from within a φ1,500 casing pile ■ Adoption of special branches that are earthquake-resistant and watertight *For more details, please download the PDF or feel free to contact us.

  • Other industrial robots

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small-diameter pipe propulsion method "Three Pipe King (R) DRM MVP301"

Response to stagnant water sand layers! A small-diameter pipe jacking method that can control the amount of soil and sand intake during advancement.

The "Sanguan King (R) DRM MVP301" is a small-diameter pipe jacking method that can accommodate saturated sand layers. It allows for control of the amount of soil intake during jacking. Complete water stoppage can be achieved when setting the pipe, preventing auger sticking. 【Features】 ■ Permeability coefficient K = 10(-2cm)/SEC to 10(-3cm)/SEC or less ■ Water head difference within 3 to 5m ■ Control of soil intake during jacking is possible ■ Tools can be used interchangeably with other models ■ Launching pit φ1500 is possible (Note: Pipe length 0.5m) *For more details, please download the PDF or feel free to contact us.

  • Other industrial robots

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Advancement Construction Method"

We will respond with various construction methods suitable for different situations and ground conditions with a diverse range of variations.

Our company conducts various "pushing methods," including the Cobra method and pipe return method. In particular, regarding pushing construction, we have accumulated various efforts, continuous pursuit, and construction achievements. Please feel free to contact us if you have any requests. 【Lineup】 ■ Cobra Method ■ Pipe Return ■ Uncle Mall ■ Envi Liner *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration